Mirakë Army Base – Tunnels 1 & 2. Design and installation of portal protection systems, including high-torsion rockfall netting and reinforced rock bolts, to secure the tunnel entrances. A 160m-long, 6m-high rockfall barrier was also constructed to safeguard the surrounding slopes.
Key Projects Through the Years
Vlora International Airport – Engineering, structural works, and complete metal framework installation for the Arrivals Terminal.
Gjirokastër Castle – Under the historic East Tower, slope stabilization works were carried out to protect the structure and surrounding terrain. A major fracture was reinforced through the installation of Ø48 rock bolts, drilled, grouted, and anchored to an 18m depth. This intervention ensured both structural stability and the preservation of the cultural monument.
Koman Hydropower Plant – Rockfall protection works were carried out on the slope rising 180m above the dam. The intervention included the installation of double-twisted high-torsion netting anchored from the crest to the waterline, combined with grouted R32 rock bolts at 3m intervals. Additional stabilization was performed on overhanging rock masses above the dam by drilling 9m deep holes and installing grouted R38 rock bolts. These measures ensured long-term slope stability and enhanced the safety of the hydropower infrastructure.
Koman Hydropower Plant – Stabilization works in the Forebay area included reinforcing a major fracture with Ø48mm rock bolts, cement-grouted and anchored to a depth of 20m. In addition, a 180m-long, 5m-high high-capacity rockfall barrier was installed along the slope above the dam to enhance safety and long-term structural stability.
Fierza Hydropower Dam – Comprehensive reconstruction and rehabilitation works, including the rebuilding of Access Tunnels Nr. 276 ASL and Nr. 230 ASL. Design, fabrication, and installation of rust-proof metal structures throughout Access Tunnel 276 ASL, as well as the design, manufacture, and installation of a steep-hill industrial lift. These interventions enhanced both operational efficiency and long-term durability of the dam infrastructure.
–Complete design, fabrication, and installation of a 4,000 sqm metal construction warehouse. The project included full structural steel works, advanced engineering solutions, and high-quality metal assembly, delivering a durable, efficient, and fully functional industrial facility.
A-1 Motorway, Montenegro – Advanced rockfall protection works were carried out to safeguard critical infrastructure in challenging mountainous terrain. The project involved the installation of 9 m deep grouted rock bolts and high-capacity rockfall barriers along exposed slopes. Through precise engineering, careful planning, and expert execution, these interventions significantly enhanced slope stability and ensured long-term safety, showcasing our capability to deliver reliable solutions in complex environments.
Podgorica – At the KAP facility, our team carried out comprehensive rehauling, rehabilitation, and maintenance of the blast furnaces, ensuring peak operational efficiency and extending the lifespan of critical industrial equipment. Through precise execution, and stringent quality control, we delivered safe, reliable, and high-performance solutions for one of Montenegro’s key metallurgical facilities.
Lengarica Hydropower Plant – Full Construction Management Services for the execution of 4 km of tunnel works and associated civil engineering tasks. The project encompassed planning, coordination, and oversight of complex underground construction activities, ensuring safety, efficiency, and timely delivery of all civil works.